Step 17

STEP 17:

INTERIOR FINISHES

Ah yes… the fresh paint now lingers. It’s time for the Interior Finishes stage which includes:



  • Installing all cabinets.
  • Installing all doors and trim (crown molding, MDF trim, block paneling, etc.)
  • Installing flooring (tile, stone, wood, faux stone, carpet, etc.), transitions, and decorative borders.
  • During this phase you will do a trim walk with the Builder to determine closet rod heights, shelf sizing and locations, etc.
BACK TO PROCESS OVERVIEW
Share by: